The short version
Not automatically. Whether you need GCC High depends on whether the prime's drawings are CUI and where you keep them. If the drawings are marked or identified as CUI and your purchase order carries DFARS 252.204-7012, any cloud service that stores them must meet the FedRAMP Moderate baseline or equivalent. GCC High is the common Microsoft answer. If you keep the drawings on premise, you may not need it. Your contract and your assessor make the final call, and this post is not legal advice.
Whatever you decide for email and files, the drawing ends up on a machine controller. GCC High stops at the desk. On the shop floor, an industrial DMZ appliance such as Trout Access Gate CMMC for OT protects the path from the CAM station to the CNC.
| Your situation | What it usually means for the IT side | What it means on the shop floor |
|---|---|---|
| Drawings are not CUI (no marking, no 7012 in the order) | No CUI rules for those files. CMMC Level 1 applies if the order carries Federal Contract Information | Level 1 safeguarding at most. Ask the prime to confirm |
| CUI drawings stored in a cloud service | The service must meet FedRAMP Moderate or equivalent. GCC High is the common Microsoft option | The CNCs and CMMs that load the programs are in scope |
| CUI drawings kept on premise only | No FedRAMP question for those files. The on-premise systems are in scope | The CNCs and CMMs that load the programs are in scope |
| ITAR-controlled drawings | US-person access rules apply on top. GCC High is the common default | Only US persons may reach the machines that hold the data |
How do you know if the prime's drawings are CUI?
Read the marking and the purchase order. The prime decides what it sends you, and it has to tell you. A drawing marked "CUI", or carrying a distribution statement or an export-control warning, is controlled. DFARS 252.204-7012 covers information that is marked or otherwise identified in the contract, and primes flow the clause down to suppliers whose work involves it.
If the order carries 7012 and the drawing is marked, treat it as CUI. If the drawing has no marking and the order has no 7012 clause, you may only have Federal Contract Information, which is CMMC Level 1. If you are unsure, ask the prime's contracts or security contact in writing and keep the answer.
When does the cloud question come up?
It comes up the moment the drawing lands in a cloud service. DFARS 252.204-7012 says that a cloud service that stores, processes or transmits covered defense information must meet security requirements equivalent to the FedRAMP Moderate baseline, and must follow the clause's terms for incident reporting, malicious code and forensic access.
For most machine shops the first cloud service the drawing touches is email. If the prime emails a CUI drawing to a commercial Microsoft 365 mailbox, that mailbox now holds CUI. Microsoft points defense contractors that handle CUI to GCC High. That is why GCC High became the default answer.
It is not the only one. Our CUI enclave architecture guide lists the usual options: GCC High through a managed provider, an encrypted email and file service built for CUI, a single hardened PC, or a hosted virtual desktop. You can also keep CUI entirely on premise, where FedRAMP does not apply because there is no cloud service. Check the FedRAMP status of any cloud option yourself, and confirm your choice with your assessor.
What if you only download the drawing from the prime's portal?
Then the question moves to where the file goes after the download. Many primes deliver drawings through their own supplier portal. The portal is the prime's responsibility. Once the file is on your side, it sits on a workstation, a file share or a cloud drive, and that system is in your scope. If it is a cloud drive, the FedRAMP requirement applies to it.
Small shops often choose to keep downloaded drawings on one on-premise file server and one CAM station. That keeps the IT side small. The machines that receive the programs are still in scope.
Where does the drawing go after the CAM station?
It goes to the machines. The CAM station turns the drawing into a toolpath. The DNC server or a shared folder sends the program to the CNC controller. The CMM loads the model to inspect the part. Every one of these systems stores or transmits CUI, so every one is in your CMMC scope.
32 CFR 170.19 lets you document CNC controllers and CMMs as specialized assets. At Level 2 they go in the inventory, the SSP and the network diagram, and you show how your policies manage them. The specialized assets guide sorts each shop-floor machine into its category.
GCC High cannot reach a CNC controller. Neither can any other IT enclave. A controller cannot join a tenant, run an agent or ask for MFA.
How does an industrial DMZ protect the machines?
An industrial DMZ sits between the IT side and the machines and controls every connection to them. In the Purdue model it is Level 3.5. Trout Access Gate does this in one appliance beside your existing network:
- It keeps the CNCs and CMMs apart from the office network. Only approved program downloads and reports go through.
- It asks each person for MFA before a session reaches a machine.
- It gives a machine vendor a time-bound session to one machine and records it.
- It logs every connection with the user, the time, the source and the target.
That covers access control, identification and authentication, audit and network protection for machines that cannot do it themselves. Access Gate CMMC for OT comes in two sizes, Access Gate CMMC and Access Gate CMMC Performance. Its VPN uses FIPS 140-3 validated modules. If you do choose GCC High, Access Gate can receive jobs from a CUI Vault GCC High enclave over a site-to-site tunnel that uses FIPS 140-3 validated modules (CMVP #5441 and #5031).
Access Gate is installed in a day. You connect it to your existing firewall or router and add one rule that forwards the machine traffic to it. Nothing is installed on the machines. The comparison with firewall segmentation and the IT enclave is in industrial DMZ, firewall segmentation or CMMC enclave.
Does the Phase II suspension change the answer?
CMMC Phase II third-party assessments have been paused since July 2026. The controls still apply. DFARS 252.204-7012 still requires NIST SP 800-171 for CUI and FedRAMP Moderate or equivalent for cloud services that hold it. The score you affirm in SPRS covers both the IT side and the machines.
For the full approach on the shop floor, see CMMC compliance for defense manufacturers. For the GCC High basics, see the GCC High glossary entry.