A water or wastewater utility keeps treating water after a ransomware attack on the office network if it prepared four things in advance. Operators know how to run every site by hand. The HMIs control the process without the office network. Clean copies of PLC and HMI programs sit offline. Someone can cut the office-to-SCADA connection in one place, quickly.
This post is for the operations superintendent, the SCADA lead or the general manager of a small or mid-sized utility. It covers what recent incidents showed, what the regulations ask, what to prepare at each type of site, and where Trout Access Gate fits.
What recent US water incidents show
In most recent cases, ransomware or intrusion hit IT systems, and operators kept water flowing by switching to manual operation. The details differ, and the pattern is consistent.
American Water, October 2024. The largest regulated US water utility detected unauthorized activity on October 3, 2024, and disclosed it in an SEC 8-K filing. It took its MyWater customer portal and billing offline. The company said it believed none of its water or wastewater facilities or operations were negatively affected (TechCrunch, TechTarget).
Arkansas City, Kansas, September 2024. On Sunday, September 22, 2024, the city found a cybersecurity incident at its water treatment facility. It switched the plant to manual operations as a precaution. The city manager said there was no disruption to service and the water supply remained safe. The city did not confirm whether ransomware was involved (SecurityWeek, TechTarget).
Minot, North Dakota, March 2026. Staff found ransomware on the water treatment plant's SCADA server on March 14, 2026. They unplugged the server and ran manual procedures, with frequent gauge checks, for about 16 hours until a replacement server was in place. The city said the plant and water system remained operational and safe at all times. The plant serves about 80,000 people across Minot and the Northwest Area Water Supply (StateScoop, The Record).
Aliquippa, Pennsylvania, November 2023. This one went straight to the controller. Attackers reached an internet-exposed Unitronics PLC at a booster station, and operators took manual control. The July 2026 attacks on more than 30 Minnesota water systems followed the same path through exposed PLCs. Both are covered in our post on US water utility cyberattacks in 2026.
The lesson from these cases is practical. The utilities that kept service running had people who could operate the plant without SCADA. The ones with the shortest outages could also restore a SCADA server from a clean copy.
What AWIA and EPA guidance ask for
America's Water Infrastructure Act already requires a cyber plan. Under Safe Drinking Water Act section 1433, a community water system serving more than 3,300 people must complete a risk and resilience assessment (RRA). It must then prepare an Emergency Response Plan (ERP) within six months. EPA states that the ERP must include strategies to improve resilience, "including the physical security and cybersecurity of the system" (EPA, AWIA Section 2013).
Both documents are reviewed and recertified every five years. For systems serving 3,301 to 49,999 people, EPA lists December 31, 2026 as the next ERP certification date, assuming the RRA was certified on its final due date. See our guides to AWIA risk and resilience certification and EPA cybersecurity requirements for water and wastewater systems.
Two federal documents give the content for that cyber section:
- Top Cyber Actions for Securing Water Systems (CISA, EPA and FBI, February 2024). Action 5 is to develop and exercise incident response and recovery plans, tested every year. Action 6 is to back up OT and IT systems, isolate the backups and follow the 3-2-1 rule (EPA fact sheet).
- Water and Wastewater Sector Incident Response Guide (CISA, FBI and EPA, January 2024). It explains who to call and what federal help is available at each stage of an incident (CISA).
The fact sheet also says to inventory first the devices where manual operation is not possible. That inventory is where the preparation below starts.
What to prepare at each type of site
Write down, for each site, what must keep working and how staff will run it without SCADA. A small utility often runs a treatment plant plus dozens of wells, tanks and lift stations. Each type of site needs a different plan.
| Site type | What must keep working | What to prepare |
|---|---|---|
| Water treatment plant | Filtration, disinfection, chemical feed, high-service pumps | Local HMI control on the plant network, manual chemical dosing procedure, operator schedule for 24-hour staffing |
| Wells | Pumps on and off by level or schedule, chlorine feed | Local hand-off-auto switches labeled and tested, a visit route with readings to record |
| Booster and pump stations | Distribution pressure | Pressure setpoints written on paper, manual start and stop procedure, a contact for the integrator who programmed the PLC |
| Storage tanks | Level readings to drive pumping | Local level gauges, a reading schedule, radio or phone contact to the plant |
| Wastewater lift stations | Pumps on float or level control, alarms | Floats tested as a backup to the PLC, a callout list, a portable pump plan for the stations that overflow first |
| Wastewater treatment plant | Aeration, solids handling, discharge within permit | Manual control of blowers and pumps, a sampling plan to stay within the discharge permit |
Staffing is usually the limit. A plant that runs with two operators on automatic control may need five on manual. Count the people, the shifts and the drive times between sites. Add a mutual aid contact, such as your state WARN network, for when the incident lasts more than a few days.
How to keep SCADA independent of the office network
Local control has to work with the office network unplugged. Test this at each site. Unplug the uplink to the office network and confirm that the HMI still shows values and still sends commands to the PLCs. Check that the HMI does not depend on an office domain controller, an office DNS server or a license server on the IT side. Those dependencies are common, and they stop the HMI at the worst moment.
Keep offline copies of every PLC and HMI program, with the setpoints. Store them on media that is not connected to any network. Keep one copy off site. Record the firmware version and the date of each copy. After an incident you restore from these copies and compare them with what is running. Minot ran on manual procedures for about 16 hours, until a replacement server was installed. A spare server and a clean program copy shorten that window.
Make the office-to-SCADA path a single point you can cut. In many small utilities the office and SCADA share a flat network, or several firewall rules and remote access tools connect them. Reduce those paths to one. Label the cable or the rule. Write down who may cut it and when. Practice cutting it during the tabletop exercise.
How operators and integrators get remote access during an outage
Plan a remote access path that does not depend on the office network. Your SCADA integrator often fixes problems remotely through a VPN that ends on the office firewall. During a ransomware response, that firewall may be shut down or under investigation. The integrator then has no way in.
Prepare a separate path now: a cellular link into the SCADA network, with MFA and a log of every session. Decide in advance who may use it and for which sites. An unmanaged modem at a pump station is the opposite of this plan. It is a path you do not control, and it stays open after the incident.
Where Access Gate fits
Access Gate controls who reaches each site's SCADA and PLCs, asks for MFA and logs every session. It works with your existing firewalls and remote access tools. It does not prevent ransomware on the office network, and it does not replace backups, manual procedures or a plan.
Access Gate Fleet is built for utilities with many small sites. The main plant gets a Hub and each remote site gets a Spoke. You manage all of them from one console, with one policy and one audit trail. Every connection from the office network to SCADA passes through Access Gate, so the office-to-SCADA path is one point you control. If the link to a remote site drops, that site keeps running on local control.
Fleet costs $24,900 per year for four sites, one Hub and three Spokes, and $2,280 per year for each extra site. The price includes the hardware, software, updates and support.
Deployment does not touch the PLCs. You connect Access Gate to your existing firewall or router and add one rule that forwards the SCADA traffic to it. Each site is up in a day. For the full picture from treatment plant to tap, see securing SCADA from treatment plant to tap and the utilities industry page.
What to do before the end of the year
Run one tabletop exercise based on a ransomware attack on the office network. CISA and EPA both publish free tabletop scenarios for water systems. Bring operations, IT, your SCADA integrator and the general manager into the same room. Walk through the first 24 hours: who cuts the connection, who calls the FBI and CISA, who drives to which site, and how you restore the SCADA server.
Then fix the three gaps the exercise finds first:
- Unplug the office uplink at one site and confirm the HMI still controls the PLCs.
- Make offline copies of every PLC and HMI program, and store one off site.
- List every remote access path into SCADA, including modems and vendor tools.
Write the results into the cybersecurity section of your ERP. If your recertification is due on December 31, 2026, this exercise gives you current material for it.